P02 · NATURE IN THE SPACE
Non-Visual Connection with Nature
Auditory, tactile, olfactory or gustatory stimuli that create a deliberate reference to nature.

How to read this pattern
A non-visual connection gains value when it is subtle, authentic and appropriate to the activity and sensory sensitivity of users
A pattern becomes design only when it is connected to people, activities, climate and the specific conditions of the site. Quality matters more than mere presence.
Three design moves
From intention
to a concrete choice
Design with more than sight
Include sound, touch, scent, air and temperature as coordinated parts of the experience.
Use authentic signals
Prefer perceptible natural processes and materials to artificial imitations.
Allow choice
Provide different levels of intensity and ways to move away from a stimulus.
P02 / Repertoire
2 elements
for exploring the pattern
Each card shows one possible translation of the pattern. Applications need to be selected and adapted rather than added automatically.
B08 · 1
Air Quality
Air Quality is one possible way to apply Non-Visual Connection with Nature. Its relevance depends on the place, the people who use it and the way it will be maintained.
- Potential benefits
- Potential benefits must be assessed against the intended users, activities and environmental conditions.
- What to observe
- Define suitable qualitative or quantitative indicators during project assessment.

B09 · 2
Sensory Variability
Sensory Variability is one possible way to apply Non-Visual Connection with Nature. Its relevance depends on the place, the people who use it and the way it will be maintained.
- Potential benefits
- Potential benefits must be assessed against the intended users, activities and environmental conditions.
- What to observe
- Define suitable qualitative or quantitative indicators during project assessment.

Observe and verify
Signals that can guide
project evaluation
- 01sensory variety
- 02user control
- 03comfort
- 04maintenance
These are possible signals, not automatic proof of benefit. Suitable methods and thresholds depend on the project.
